Moray Place, EH3

Moray Place, EH3

Zebra were contracted to carry out internal renovations, including the formation of a new en-suite and construct a statement extension into the garden of this Georgian House. The intention was to combine the history of the building with the modern world. The extension comprised a mixture of flat and pitched roofs, using reclaimed Scottish slate…

Huntingdon Street, N1

Huntingdon Street, N1

Zebra were contracted to conduct a full house renovation. This was a major extension and refurbishment project including a basement dig out. Zebra created a ground floor rear extension leading to the garden, and a loft conversion to include a roof terrace. Works included installing Polished Concrete staircase to basement, Structural Glazing to rear extension…

Eskbank, EH22

Eskbank, EH22

A client in Dalkeith, Scotland contracted Zebra to transform the current extension into a new kitchen/living room. The existing slate extension was demolished to create a new 65m2 space. Externally, the extension featured a large cantilever roof structure, clad in zinc, to provide a sheltered outside area. The walls were a combination of existing masonry…

Cipher House, SW15

Cipher House, SW15

Designed by architect Christian Clemares from CCASA Architects Ltd, Zebra worked for developers Love Property Ltd to create this modern, imaginative 2-bedroom new build eco house, built across ground and basement level adjacent to an existing 1960s house in Putney. Work included large areas of glazing, a bespoke floating staircase and a featured glass link…

Oncore Gym, SW4

Oncore Gym, SW4

Zebra were asked to complete an Architect led scheme for a client looking to open an ultra-high-end Fitness Studio in a basement beneath a residential block of new build apartments. The project involved fitting a  specialist sprung floor in the studio area, a large joinery package (including Iroko timber sliding panels, Iroko timber clad ceiling,…

Bread & Roses Pub, SW4

Bread & Roses Pub, SW4

Zebra were called after the original contractors were given notice. Zebra cleaned up the site and carried out the refurbishment to the clients’ requests. Zebra worked closely with the client and utilised their extensive network to introduce industry-leading professionals to the project. Works included installing a bespoke bar with copper top, supply & install banquet…